A single elevator replaced the spear observe and ran the whole size of the height on the barn. A second elevator was both installed in a thirty-degree slope over the side with the barn to lift bales as many as the peak elevator or used dual front-again chains bordering the bale to carry bales straight up the aspect of the barn to the peak elevator.